Cycleton SKBJ 2017

Technical sheet

53064034
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 8.86 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: Yes
  • ↗
    Vertical gain: + 96 m
  • ↘
    Vertical drop: - 99 m

  • ▲
    Highest point: 73 m
  • ▼
    Lowest point: 15 m
  • ⚑
    Start/End: N 3.10704° / E 101.53109°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S/E : km 0 - alt. 46 m - Start near Jalan Serambi U8/21, Bukit Jelutong, 40150 Shah Alam, Selangor, Malaysia
  2. 2 : km 0.01 - alt. 46 m - Turn right onto Jalan Serambi U8/21
  3. 3 : km 0.33 - alt. 51 m - Turn left onto Jalan Jendela U8/20
  4. 4 : km 1.08 - alt. 29 m - At the roundabout, continue straight onto Jalan Lelangit U8/46
  5. 5 : km 3.4 - alt. 37 m - Turn right at the 1st cross street onto Persiaran Gerbang Utama
  6. 6 : km 5.65 - alt. 22 m - At the roundabout, take the 3rd exit onto Persiaran Balairong
  7. 7 : km 6.03 - alt. 22 m - At the roundabout, take the 1st exit onto Jalan Bazar U8/101a
  8. 8 : km 6.2 - alt. 16 m - Turn left onto Jalan Bazar U8/101
  9. 9 : km 6.41 - alt. 19 m - Slight left onto Persiaran Gerbang Utama
  10. 10 : km 6.53 - alt. 22 m - At the roundabout, take the 4th exit and stay on Persiaran Gerbang Utama
  11. 11 : km 7.01 - alt. 17 m - At the roundabout, take the 1st exit onto Persiaran Tebar Layar
  12. 12 : km 7.3 - alt. 21 m - Turn left at the 1st cross street onto Persiaran Singgahsana
  13. 13 : km 7.39 - alt. 21 m - Turn right onto Jalan Jendela U8/20
  14. 14 : km 8.51 - alt. 51 m - Turn left onto Jalan Serambi U8/21
  15. 15 : km 8.83 - alt. 46 m - Turn left
  16. S/E : km 8.86 - alt. 45 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…