Hotel Melaka To Hotel Batu Pahat

Technical sheet

54685201
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 99.40 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: No
  • ↗
    Vertical gain: + 25 m
  • ↘
    Vertical drop: - 20 m

  • ▲
    Highest point: 26 m
  • ▼
    Lowest point: 2 m
  • ⚑
    Start: N 2.199117° / E 102.247777°
  • ⚑
    End: N 1.867681° / E 102.942413°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S : km 0 - alt. 6 m
  2. 1 : km 0.17 - alt. 7 m - Turn left onto Jalan Kampung Pantai
  3. 2 : km 0.53 - alt. 8 m - Keep right onto Lorong Hang Jebat
  4. 3 : km 0.86 - alt. 12 m - Keep left onto Jalan Laksamana
  5. 4 : km 0.9 - alt. 12 m - Turn left onto Jalan Merdeka
  6. 5 : km 1.92 - alt. 7 m - Keep right
  7. 6 : km 2.19 - alt. 14 m - Keep left and drive toward Kuala Lumpur, Johor Bahru, Masjid Tanah, Muar
  8. 7 : km 3.51 - alt. 7 m - Keep left
  9. 8 : km 4.71 - alt. 9 m - Keep right and drive toward Ujong Pasir, Padang Temu
  10. 9 : km 5.26 - alt. 7 m - Keep left onto Lorong Bukit Senjuang
  11. 10 : km 5.29 - alt. 7 m - Turn slight left onto Jalan Ujong Pasir
  12. 11 : km 10.2 - alt. 5 m - Turn right onto Jalan Melaka - Muar
  13. 12 : km 34.63 - alt. 4 m - Turn right onto Lebuh AMJ
  14. 13 : km 41.53 - alt. 6 m - Keep left toward 23
  15. 14 : km 41.82 - alt. 5 m - Keep right toward 23
  16. 15 : km 41.91 - alt. 7 m - Turn right onto Jalan Muar-Segamat
  17. 16 : km 45.93 - alt. 7 m - Turn right onto Jalan Bentayan
  18. 17 : km 46.03 - alt. 7 m - Turn left
  19. 18 : km 46.14 - alt. 7 m - Turn right onto Jalan Perdagangan
  20. 19 : km 46.21 - alt. 6 m - At roundabout, take exit 2 onto Jalan Arab
  21. 20 : km 47.05 - alt. 11 m - At roundabout, take exit 1 onto Jalan Sulaiman
  22. 21 : km 97.74 - alt. 8 m - Turn left onto Jalan Tongkang Pechah and drive toward Tongkang Pecah, Parit Sulong, Yong Peng, Kuala Lumpur, Johor Bahru
  23. 22 : km 99.1 - alt. 7 m - Turn right onto Jalan Tan Swee Hoe
  24. E : km 99.4 - alt. 8 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…