GCE - Kundang

Technical sheet

51395710
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 61.73 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: Yes
  • ↗
    Vertical gain: + 718 m
  • ↘
    Vertical drop: - 722 m

  • ▲
    Highest point: 80 m
  • ▼
    Lowest point: 16 m
  • ⚑
    Start/End: N 3.103357° / E 101.527837°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S/E : km 0 - alt. 44 m - Start on
  2. 2 : km 0.02 - alt. 43 m - Turn right
  3. 3 : km 0.14 - alt. 42 m - At roundabout, take exit 2 onto Jalan Serambi U8/21
  4. 4 : km 1 - alt. 51 m - Turn right onto Jalan Jendela U8/20
  5. 5 : km 2.11 - alt. 21 m - Turn left onto Persiaran Singgahsana
  6. 6 : km 2.2 - alt. 21 m - Turn left onto Persiaran Tebar Layar
  7. 7 : km 2.48 - alt. 17 m - Keep left
  8. 8 : km 23.03 - alt. 44 m - Keep left
  9. 9 : km 26.07 - alt. 21 m - Keep left onto Exit 2505
  10. 10 : km 26.9 - alt. 26 m - Turn right onto Jalan Besar Kundang, B149
  11. 11 : km 28.02 - alt. 26 m - Turn left
  12. 12 : km 28.12 - alt. 26 m - Turn right onto Jalan Besar Kundang, B149
  13. 13 : km 28.9 - alt. 28 m - Turn left
  14. 14 : km 28.9 - alt. 28 m - Turn left onto Jalan Besar Kundang, B149
  15. 15 : km 29.11 - alt. 29 m - Keep left
  16. 16 : km 32.8 - alt. 56 m - Keep left
  17. 17 : km 47.66 - alt. 67 m - Keep left
  18. 18 : km 47.92 - alt. 42 m - Keep left
  19. 19 : km 48.5 - alt. 26 m - Turn right
  20. 20 : km 48.72 - alt. 24 m - Turn slight left onto Jalan Sungai Buloh, 15
  21. 21 : km 53.05 - alt. 24 m - Keep right onto Persiaran Gerbang Utama
  22. 22 : km 53.22 - alt. 27 m - Turn right
  23. 23 : km 53.68 - alt. 30 m - Keep right
  24. 24 : km 54.16 - alt. 44 m - Keep left
  25. 25 : km 54.7 - alt. 68 m - Keep left
  26. 26 : km 55.05 - alt. 59 m - Turn right onto Jalan Ungu U9/33
  27. 27 : km 55.08 - alt. 62 m - Turn right
  28. 28 : km 55.58 - alt. 62 m - Keep left onto B49
  29. 29 : km 57.12 - alt. 24 m - Keep left
  30. 30 : km 58.37 - alt. 30 m - Keep left
  31. 31 : km 58.8 - alt. 22 m - Keep right onto Bukit Jelutong Sentral
  32. 32 : km 58.92 - alt. 16 m - Turn right onto Persiaran Tebar Layar
  33. 33 : km 59.54 - alt. 20 m - Turn right onto Persiaran Singgahsana
  34. 34 : km 59.64 - alt. 21 m - Turn right onto Jalan Jendela U8/20
  35. 35 : km 60.76 - alt. 51 m - Turn left onto Jalan Serambi U8/21
  36. 36 : km 61.59 - alt. 42 m - At roundabout, take exit 2
  37. 37 : km 61.72 - alt. 43 m - Turn left
  38. S/E : km 61.73 - alt. 44 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…