HOME TO PASIR RIS

Technical sheet

54656332
Creation
Last update
  • Road biking
    Activity: Road biking
  • ↔
    Distance: 12.79 km
  • ◔
    Author’s time: Duration unknown 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: No
  • ↗
    Vertical gain: + 35 m
  • ↘
    Vertical drop: - 41 m

  • ▲
    Highest point: 29 m
  • ▼
    Lowest point: 0 m
  • ⚑
    Start: N 1.352359° / E 103.880277°
  • ⚑
    End: N 1.372199° / E 103.946879°

  • ◶
    Path proportions: Not specified

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S : km 0 - alt. 25 m - Start on
  2. 2 : km 0.06 - alt. 26 m - Turn right
  3. 3 : km 0.12 - alt. 23 m - Keep right
  4. 4 : km 0.15 - alt. 23 m - Turn right onto Jalan Pelikat Park Connector
  5. 5 : km 0.7 - alt. 19 m - Keep right onto Jalan Pelikat Park Connector
  6. 6 : km 1.54 - alt. 14 m - Turn sharp right onto Jalan Pelikat Park Connector
  7. 7 : km 1.7 - alt. 18 m - Turn right
  8. 8 : km 1.8 - alt. 19 m - Turn right onto Hougang Ave 3 Park Connector
  9. 9 : km 2.26 - alt. 12 m - Turn slight left onto Hougang Ave 3 Park Connector
  10. 10 : km 2.27 - alt. 12 m - Turn slight left onto Hougang Ave 3 Park Connector
  11. 11 : km 2.79 - alt. 8 m - Turn left onto Defu Avenue 1
  12. 12 : km 2.82 - alt. 8 m - Turn right
  13. 13 : km 2.84 - alt. 9 m - Turn slight left onto Serangoon Park Connector
  14. 14 : km 2.85 - alt. 9 m - Turn slight left onto Serangoon Park Connector
  15. 15 : km 5.21 - alt. 10 m - Turn right onto Sungei Serangoon Park Connector
  16. 16 : km 5.6 - alt. 7 m - Keep right onto Sungei Serangoon Park Connector
  17. 17 : km 8.33 - alt. 0 m - Turn right
  18. 18 : km 8.57 - alt. 8 m - Turn right
  19. 19 : km 8.59 - alt. 7 m - Turn right onto Pasir Ris Farmway 3
  20. 20 : km 8.64 - alt. 7 m - Turn left onto Pasir Ris Farmway 3
  21. 21 : km 9.8 - alt. 6 m - Turn left
  22. 22 : km 9.81 - alt. 7 m - Turn right onto Lorong Halus Park Connector
  23. 23 : km 10.64 - alt. 18 m - Turn left onto Pasir Ris Drive 12
  24. 24 : km 12.3 - alt. 16 m - Turn right onto Pasir Ris Green
  25. 25 : km 12.72 - alt. 22 m - Turn right onto Pasir Ris Drive 1
  26. E : km 12.79 - alt. 20 m

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…