Penang Eco 100 2019

Technical sheet

52272085
Creation
Last update
  • Walking
    Activity: Walking
  • ↔
    Distance: 169.44 km
  • ◔
    Calculated time: 59h 30 
  • ▲
    Difficulty: Not specified

  • ⚐
    Return to departure point: No
  • ↗
    Vertical gain: + 3,876 m
  • ↘
    Vertical drop: - 3,890 m

  • ▲
    Highest point: 497 m
  • ▼
    Lowest point: 1 m
  • ⚑
    Start: N 5.35687° / E 100.49252°
  • ⚑
    End: N 5.39023° / E 100.52215°

  • Today’s forecast: … Loading…

Description

Start the plot by indicating the starting point. If you know the exact car parking situation, please explain how to park.
If we can access the starting point with public transports, please explain the lines to use and share any useful informations.

(S) From here, describe the instructions to follow from the starting point.

Add waypoints by clicking on the map.

The plot has to end by the location where the walk finishes. If it is a loop please write (S/E) at the end of the description. If it is a one way route write (E).

Waypoints

  1. S : km 0 - alt. 52 m
  2. 1 : km 10.71 - alt. 11 m - CPA Juru - CPA Juru
  3. 2 : km 21.14 - alt. 6 m - CPB Fishermen's Port - CPB Fishermen's Port
  4. 3 : km 34.73 - alt. 6 m - CPC Permatang Tinggi - CPC Permatang Tinggi
  5. 4 : km 45.67 - alt. 42 m - CPD Bidara - CPD Bidara
  6. 5 : km 58.3 - alt. 66 m - CPE Machang Indah - CPE Machang Indah
  7. 6 : km 66.12 - alt. 36 m - CPF Sungai Lembu - CPF Sungai Lembu
  8. 7 : km 76.56 - alt. 24 m - CP1 Lunas - CP1 Lunas
  9. 8 : km 86.59 - alt. 9 m - CP2 Hidden Landscape - CP2 Hidden Landscape
  10. 9 : km 96.24 - alt. 8 m - CP3 Pump House - CP3 Pump House
  11. 10 : km 109.43 - alt. 132 m - CP4 Suling Hill - CP4 Suling Hill
  12. 11 : km 115.81 - alt. 36 m - CP5 Sungai Lembu - CP5 Sungai Lembu
  13. 12 : km 126.3 - alt. 148 m - CP6 Tokun Riverside - CP6 Tokun Riverside
  14. 13 : km 136.39 - alt. 14 m - CP7 Berapit - CP7 Berapit
  15. 14 : km 145.01 - alt. 324 m - CP8 Kampong Besar - CP8 Kampong Besar
  16. 15 : km 149.18 - alt. 52 m - CP9 Tokun Dam - CP9 Tokun Dam
  17. 16 : km 153.54 - alt. 161 m - CP10 Tokun Hut - CP10 Tokun Hut
  18. 17 : km 162.58 - alt. 235 m - CP11 Seraya Trigona - CP11 Seraya Trigona
  19. E : km 169.44 - alt. 35 m - FINISH Sungai Lembu - FINISH Sungai Lembu

Useful Information

Always stay careful and alert while following a route. Visorando and the author of this walk cannot be held responsible in the event of an accident during this route.

The GPS track and description are the property of the author.

Loading…